Projects

Commercial roofing projects

A look at the kind of work we do, full tear-offs over live production lines, restoration coatings that add a decade of life, complex retrofits, and emergency response under active storms. Delivered on schedule, with the building running.

Project profiles

Recent work across Ontario

Industrial re-roof over live assembly lines

Industrial

Full tear-off and replacement over active, running assembly lines, divided into tight daily phases, materials staged on weekends.

Size
110,000 sq ft
Downtime
Zero
Warehouse & showroom TPO re-roof

Re-Roofing

Multi-tenant warehouse & showroom — a saturated built-up roof replaced with a fully adhered 60-mil TPO system over new polyiso insulation.

Size
32,000 sq ft
Timeline
14 days
Silicone coating restoration

Coating

Aged modified-bitumen roof restored, flashing splits repaired, surface cleaned and a high-solids silicone coating applied to extend certified life.

Size
15,000 sq ft
Life added
10 years
EPDM exhaust retrofit

Retrofit

Two 4×4-ft structural openings cut through a sound EPDM deck for exhaust upgrades, steel curbs welded in, penetrations flashed, warranty preserved.

System
EPDM
Warranty
Preserved
High school multi-wing replacement

Institutional

Complete multi-wing roof replacement at a regional high school, completed, inspected and cleared inside the summer break window.

Window
7 weeks
Result
On time
Plaza phased renovation

Retail

Phased multi-tenant plaza renovation — crews moved unit-by-unit down the strip, coordinating with each store manager so trade continued below.

Size
45,000 sq ft
Stores
Stayed open
12-storey residential tower re-roof

Multi-Residential

Full structural roof replacement on an occupied 12-storey residential tower — daily crane logistics and safety protocols with minimal resident disruption.

Height
12 storeys
Status
Occupied
Emergency storm stabilization

Emergency

Wind-delaminated membrane corner on a logistics facility — crew on-site under active storm by 11:15 p.m., tarped and stabilized, permanent patch at first light.

Area
1,500 sq ft
Saved
Inventory

Your building next

Let's talk about your roof

Whatever your building type, we'll bring the same phasing, safety and communication discipline to your project.